首页> 外文会议>PLM 2013 >Incomplete BIM Implementation: Exploring Challenges and the Role of Product Lifecycle Management Functions
【24h】

Incomplete BIM Implementation: Exploring Challenges and the Role of Product Lifecycle Management Functions

机译:不完整的BIM实现:探索挑战和产品生命周期管理功能的作用

获取原文

摘要

Implementing the BIM methodology relies on mastering new digital ways of working. However approaches to BIM often lack a holistic perspective that span the whole building lifecycle. The omission of Product Lifecycle Management functions in the implementation of the BIM methodology can lead to failures in delivering the benefits of BIM to operations and diminish its value to clients with large property portfolios. In an empirical study, the paper presents an investigation into the current situation of BIM using an Australian commercial property development project. It explores implications of partial implementation for the building lifecycle. Case study findings identify deficiencies in the project environment, management shortcomings associated with the specifics of client requirements, and difficulties in the transverse use of BIM and PLM platforms due to human interface problems.
机译:实施BIM方法依赖于掌握新的数字方式。然而,BIM的方法通常缺乏整体建筑物生命周期的整体角度。在BIM方法的实施中省略产品生命周期管理功能可能导致在提供BIM的好处,并将其价值递减给具有大型物业投资组合的客户端。在一个实证研究中,本文介绍了使用澳大利亚商业物业开发项目对BIM现状的调查。它探讨了部分实施为建筑物生命周期的影响。案例研究调查结果确定项目环境中的缺陷,管理缺点与客户要求的具体细节相关,以及由于人为界面问题导致BIM和PLM平台的跨性使用。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号