首页> 外文会议>International Conference on Greenhouse Gas Technologies >Project Status and Research Plans of 500 TPD CO2 Capture and Sequestration Demonstration at Alabama Power's Plant Barry
【24h】

Project Status and Research Plans of 500 TPD CO2 Capture and Sequestration Demonstration at Alabama Power's Plant Barry

机译:Alabama Power植物Barry 500TPD CO2捕获和封存示范的项目现状和研究计划

获取原文

摘要

Southern Company and Mitsubishi Heavy Industries Ltd. (MHI) successfully started the world's largest (500 metric TPD) carbon capture plant utilizing MHI's KM-CDR? on a coal-fired power plant in June 2011 at Alabama Power's Plant Barry. The captured CO2 is transported via pipeline approximately 12 miles to Citronelle oil field where it is injected into the Paluxy formation, a saline reservoir, for storage. This part of the CCS demonstration project is the DOE funded Southeast Regional Carbon Sequestration Partnership (SECARB) phase III Anthropogenic Test. This paper will include the status and results to date of this demonstration project along with research plans associated with the 500 TPD CO2 capture facility.
机译:南方公司和三菱重工业有限公司(MHI)成功启动了世界上最大(500公吨)碳捕获厂,利用MHI的KM-CDR?在2011年6月在阿拉巴马州电力植物巴里燃煤发电厂。捕获的二氧化碳通过管道运输,大约12英里到CITRONLELLE油田,其中它被注入帕曲线形成,盐水储存器进行储存。 CCS示范项目的这一部分是DOE资助的东南区域碳封存伙伴关系(SECARB)III期人为试验。本文将包括与与500 TPD二氧化碳捕获设施相关的研究计划以及与500 TPD CO2捕获设施相关的研究计划的状态和结果。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号