首页> 外文会议>SPE Russian Petroleum Technology Conference and Exhibition >Successful CT Intervention for Re-Frac on Horizontal Oil Well After 2 Years of Production Completed with Full Bore Liner with Frac Ports Controlled by Shifting Tool
【24h】

Successful CT Intervention for Re-Frac on Horizontal Oil Well After 2 Years of Production Completed with Full Bore Liner with Frac Ports Controlled by Shifting Tool

机译:成功的CT干预在2年后通过带有换档工具控制的FRAC端口完成2年后的水平油状物的重新磨削。

获取原文

摘要

In 2016 it was received the first experience of Coiled Tubing Intervention for Re-frac on horizontal oil well after 2 years of production completed with full bore MSF liner with frac ports operated by CT shifting tool. The main tasks for Coiled Tubing service setted by customer were effective wellbore preparation of horizontal oil well after 2 years of continuous production, the following frac ports opening and closing by CT in predetermined order for selective fracturings and final clean out and nitrogen kick-off for getting well into production.
机译:2016年,经过2年的生产完成后,通过CT移位工具运营的FRAC端口完成的完整钻孔MSF衬垫,收到了润滑井中的RE-FRAC对水平油状水平油管干预的第一种体验。 由客户设置的盘绕管服务的主要任务是在连续生产2年后的卧式油井的有效制备,下面的FRAC端口打开和关闭CT,以预定顺序为选择性断裂和最终清洁和氮气启动 进入生产。

著录项

相似文献

  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号