【24h】

Methods of Removing Buildings Deflection Used in Poland

机译:去除波兰中使用的建筑偏转的方法

获取原文

摘要

The deflection of the building in relation to the vertical is caused by its uneven lowering. The deflection hinders the use of the building and causes occurrence of the additional inner forces which the construction of the building is not designed to take. Therefore, the deflections of the buildings should be removed. Three methods of removing building deflection have been used in Poland. The first method is removing the soil from under the part of the building which is positioned too high. The second method is elevating parts of the building that are too low. The third method is simultaneous removing the soil and elevating the building. In this work all three methods are presented and analysed showing their advantages and disadvantages. Removing the soil from under the part of the building which is positioned too high can be achieved by drilling holes under the building or cutting parts of the soil under the building. After removing the soil, the building returns to the vertical. The advantage of this method is no interference in the construction of the building. The disadvantages are the lack of precise control over the process and the necessity of occupancy for the construction site the considerable area around the building. The second method to remove the deflection of building is elevating using the hydraulic jacks. These jacks are usually built-up in the openings made in the walls of the lowest level. Removing deflection through elevating is performed through inflicting shifting to the jacks. It consists of three phases: tearing the building, steady elevating and not steady elevating. In practice two types of jacks are used: hydraulic piston jacks and hydraulic diaphragm jacks. These jacks can be manually or computer controlled. The advantage of this method is full control of the levelling process. The disadvantage is the interference in the construction of the building (tearing the building). The last method is simultaneous elevating parts of the building located too low and lowering parts of the building positioned too high. Removing building deflection through non uniform elevating with the help of hydraulic piston jacks is the method being used the most often.
机译:建筑物与垂直有关的偏转是由其不均匀的降低引起的。偏转阻碍了建筑物的使用,并导致建筑物建设的额外内部力的发生。因此,应删除建筑物的偏转。在波兰使用了三种去除建筑偏转方法。第一种方法是从建筑物的一部分中除去土壤,其定位得太高。第二种方法是提升太低的建筑物的部分。第三种方法是同时去除土壤并提升建筑物。在这项工作中,展示并分析了所有三种方法,展示了它们的优缺点。从建筑物的一部分中除去土壤,该建筑物的位置太高可以通过钻孔在建筑物下的土壤的建筑物或切割部分下进行钻孔来实现。在去除土壤后,建筑物返回垂直。该方法的优点在建筑物的结构中没有干扰。缺点是对该过程缺乏准确控制和建筑工地占用的必要性,这座建筑周围的相当大的区域。去除建筑物偏转的第二种方法使用液压千斤顶升高。这些千斤顶通常在最低水平的墙壁上设立。通过向千斤顶施加换档来执行通过升降的去除偏转。它由三个阶段组成:撕裂建筑物,稳定的提升,而不是稳定的提升。实际上使用了两种类型的千斤顶:液压活塞千斤顶和液压隔膜千斤顶。这些千斤顶可以手动或计算机控制。该方法的优点是对调平过程的完全控制。缺点是在建筑物建设中的干扰(撕裂建筑物)。最后一种方法是同时提升建筑物的建筑物的部分太低,下降的建筑物的位置太高。通过液压活塞插座的帮助去除通过均匀升高的建筑偏转是最常用的方法。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号