Demolition Accounting in Residential Building Project; Case Study of the Wuhan Tiandi Mixed-Use Development (WHTD) * (April)2016

机译:拆迁住宅建筑项目;武汉天迪混合用途发展案例研究(WHTD)*(四月)2016

获取原文

摘要

In this Decade, First visitors to China are impressed by two things; the skyscrapers and Demolition sites, this paper strives to settle down the demolition dust in Residential Building Projects (RBP) by Accounting's help. Between 2008 and 2010, around 1.8 billion square meters(SQMT) of floor space was demolished [1] .And only in 2011, 1.9 billion SQMT of residential floor space was built in China. The Ministry of Housing and Urban-Rural Development has not released a figure for housing demolitions for nearly a decade [2]. All profit and loss of Demolition process should add to the new construction process to reach a better and accurate Environmental Accounting result for the best decision-making. Calculates the Total Demolition Cost (TDC), by finding the 5 main demolition costs are available in this paper. Five main costs consists; Workers wage(Ww), Rental Equipment cost(REc), Permit Fee(Pf), Sorting Cost (Sc) and Removal cost of hazardous material (Rhmc).Transportation cost from demolition site to the landfill site and landfill cost are not calculated in this paper because, these figures shall be calculated in Waste process. The major questions that this paper strives to answer is: what is the TDC for 1 SQMT of RBP of Wuhan Tiandi? And, what is the contribution of 5 waste material groups of total demolition cost? Refere to the table 2 and from the results of this study, The average cost for demolition process in Wuhan Tiandi is about 115 Yuan (19.04 Dollar) per square meter, provided this figure is much bigger in US (about 50 to 80 Yuan per SQMT) this is a rough estimate for RBP in China.
机译:在这十年中,两件事给中国的第一个游客留下了深刻的印象;摩天大楼和拆迁场地,本文致力于通过会计的帮助抵御住宅建筑项目(RBP)的拆迁粉尘。在2008年至2010年期间,拆除了大约18亿平方米(SQMT)的地面空间[1]。只有2011年才会在2011年,在中国建造了119亿平方米的住宅空间。住房和城乡发展部尚未发布近十年的住房拆迁人物[2]。拆迁过程的所有损失应加入新的建设过程,以达到最佳决策的更好,准确的环境核算结果。通过查找本文提供的5个主要拆除成本来计算总拆除成本(TDC)。五个主要成本包括;工人工资(WW),租赁设备成本(REC),允许费用(PF),排序成本(SC)和危险物质的去除成本(RHMC)。从拆除现场到垃圾填埋场和垃圾填埋场的拆迁成本并未计算本文,因为,这些数字应在废物过程中计算。本文致力于回答的主要问题是:武汉天迪的1平方米的TDC是什么?并且,5种废料集团的总拆除成本的贡献是什么?裁减表2,从本研究结果中,武汉天迪拆迁过程的平均成本约为每平方米115元(19.04美元),提供了这一数字在我们(每平方英尺约50至80元) )这是对中国RBP的粗略估计。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号