Utilizing the expanding capabilities of Microtunneling to overcome access concerns on Oregon Avenue in Washington DC

机译:利用Microtunneling的扩展功能克服华盛顿特区俄勒冈州大道的访问问题

获取原文

摘要

DC Water is improving water quality in Washington DC by replacing aging pipelines. The Oregon Avenue NW Sewer Rehabilitation project was constructed by Bradshaw Construction to replace and improve sewers in Rock Creek Park and Bingham Drive. Of the project’s 4,300 feet of new 24-inch sewer, 2,700 feet was installed by microtunneling through the variable rock conditions at up to 90 feet deep. Work areas were particularly challenging as the project was located between a quiet, residential neighborhood and Rock Creek Park. Access had to be maintained for residents, emergency services and visitors to the National Park. To minimize public impact, Bradshaw reduced the 7 designed tunnels to 3 including a single 1,860-foot drive and a 430-foot S-curve with a 625-foot radii. The collaboration and flexibility of the Oregon Avenue team allowed the project to show how far we can push the push the capabilities of microtunneling.
机译:DC水通过更换老化管道来改善华盛顿特区的水质。俄勒冈州大道NW下水道康复项目由Bradshaw Construction建造,以更换和改进岩石公园和宾厄姆驱动器的下水道。该项目的4,300英尺新的24英寸下水道,2700英尺通过Microtunneling穿过可变岩石条件,深度为90英尺深。由于该项目位于安静,住宅区和岩石溪公园之间,工作区域特别具有挑战性。必须为国家公园提供居民,紧急服务和访客的访问。为了最大限度地减少公共影响,Bradshaw将7个设计的隧道减少到3个,包括单个1,860英尺的驱动器和带625英尺的半径的430英尺的S曲线。俄勒冈大道团队的合作和灵活性允许该项目显示我们可以推动Microtunneling的能力。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号