首页> 外文会议> >Long term settlement of piles under repetitive loading from trains
【24h】

Long term settlement of piles under repetitive loading from trains

机译:火车反复荷载下的桩的长期沉降

获取原文
获取原文并翻译 | 示例

摘要

In order to provide a reliable support to ballasted track for high speed railway lines under the onerous geometrical constraints and soft ground conditions covering 7km of CTRL crossing the North Thames marshes, careful analysis of pile loads and associated cumulative settlements was necessary. A design methodology involving full scale, cyclic pile load test results coupled with full 3D dynamic finite element analyses has enabled a structurally efficient and cost effective foundation solution to be found and implemented on site. It is recommended that, for high speed lines which cross such soft ground conditions, special methods of analysis and design following those presented herein are required where the ratio of live (train) loading to dead (static) load on the support system exceeds 0.5.
机译:为了在繁重的几何约束和柔软的地面条件下(跨越北泰晤士河沼泽地7公里的CTRL)为高速铁路的压载轨道提供可靠的支持,必须仔细分析桩荷载和相关的累积沉降。一种包含全面循环荷载测试结果以及完整3D动态有限元分析的设计方法,可以在现场找到并实施结构有效且具有成本效益的基础解决方案。对于跨越此类软土地条件的高速线路,建议在支撑系统上的活(火车)载荷与静(静态)载荷之比超过0.5的情况下,需要遵循本文介绍的特殊分析和设计方法。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号