Failure of Saddle Dam, Xe-Pian Xe-Namnoy Project: Executive Summary

机译:马鞍水坝失败,XE-PIAN XE-NAMNOY项目:执行摘要

获取原文

摘要

The Saddle Dam D at the Hydroelectric Power project Xe-Pian Xe-Namnoy in the Lao People's Democratic Republic failed on July 23, 2018. An Independent Expert Panel (IEP) was established to investigate into and report on the failure of the embankment dam. The Executive Summary of the IEP final report (Anton J. Schleiss, Jean-Pierre Tournier, and Ahmed F. Chraibi, Report of Independent Expert Panel (IEP), Xe-Pian Xe-Namnoy Project-Failure of Saddle Dam D, Final Report. 20 March 2019) is presented here.
机译:在2018年7月23日,老挝人民民主共和国的水力发电工程XE-PIAN XE-Namnoy的马鞍水坝D失败了。成立了一个独立的专家小组(IEP),调查堤防大坝失败并报告。 IEP最终报告的执行摘要(Anton J. Schleiss,Jean-Pierre Tournier和Ahmed F.Charaibi,独立专家小组(IEP)的报告,XE-PIAN XE-Namnoy Project-Fornal Of Saddle Dam D,最终报告 。2019年3月20日)在这里提供。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号