Multi-station integration is the integration of various stations such as substation, energy storage station, data center, photovoltaic station, and 5G base station. In order to solve the problem of optimal design and coordinated operation of multi-station under the constraints of station conditions, load demand and economic benefits, this paper presented the capacity planning method and economic analysis of each station in multi-station. Firstly, the integration relationship between stations in multi-station was analyzed. Then, the capacity of each station was planned with the goal of maximizing the utilization rate of existing substation site and meeting the demand of surrounding load. Finally, the economic benefit of the configured capacity was analyzed with a case to provide reference for multi-station project.
机译:多站集成是各种车站的集成,如变电站,能量存储站,数据中心,光伏站和5G基站。 为了解决车站条件约束,负荷需求和经济效益下多站的最优设计和协调运行问题,本文介绍了多站的每个站的容量规划方法和经济分析。 首先,分析了多站的电台之间的集成关系。 然后,计划每个站的容量,目标是最大化现有变电站现场的利用率并满足周围负荷需求的目标。 最后,用案例分析了配置容量的经济效益,以便为多站项目提供参考。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号