首页> 外文会议>International Conference on Power System Technology >Performance studies of three gorges - Changzhou ±500kV HVDC project
【24h】

Performance studies of three gorges - Changzhou ±500kV HVDC project

机译:三峡的性能研究 - 常州±500kV HVDC项目

获取原文

摘要

In this paper, the consultant study results of Three Gorges -Changzhou HVDC Project were summarized. The characteristics and performance requirements of this project were introduced. In specifying performance requirements, the special features of this project, conditions and requirements of both side AC systems as well as environment conditions and requirements were considered carefully. The most up to date technology of HVDC and computerized controls were followed. Efforts have been paid to promote development of HVDC technology and to minimize the cost of the project with the basis of ensuring security and stability of the AC/DC systems.
机译:本文综述了三峡委员会研究结果 - 总结了陈杭州HVDC项目。介绍了该项目的特点和性能要求。在指定性能要求时,仔细考虑了该项目的特殊功能,侧面交流系统以及环境条件和要求的特殊功能。遵循最新的HVDC和计算机化控制的最新技术。努力促进HVDC技术的发展,并以确保AC / DC系统的安全和稳定性,最大​​限度地降低项目的成本。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号