2020 Pittsburgh Coal Conference Coal-Based Power Plants of the Future: Electricity and Ammonia Polygeneration

机译:2020年匹兹堡煤炭大会未来燃煤发电厂:电力和氨多联产

获取原文

摘要

1. O&M and fuel rates represented in dollars per hour to better reflect the realities of a polygeneration plant 2. Greatest contributor to variance arises in Fuel Costs with the Zero Net Power case using "35% less fuel (in S/hr) relative to the other defined operating points, accounting for over 90% of the total difference in O&M plus Fuel Costs 3. Key takeaway is that the O&M plus Fuel Costs is dominated by the utilization of the gasif ier as opposed to the final syngas distribution between the power island and the ammonia train.
机译:1.运行维护和燃料费率以美元/小时表示,以更好地反映多联产电厂的实际情况2。造成差异的最大因素是燃油成本,在净功率为零的情况下,使用“减少35%的燃油(以秒/小时为单位)”相对于其他定义的运行点,占运维加燃料成本总差异的90%以上3。关键在于,O&M加燃料成本主要取决于天然气的利用率,而不是动力岛和氨装置之间的最终合成气分配。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号