The Evolution of Tunnel Boring Machine Requirements over the Course of a Project

机译:整个项目中隧道掘进机需求的演变

获取原文
获取原文并翻译 | 示例

摘要

The requirements for a tunnel boring machine (TBM) evolve over the course of a project. From planning to design tornconstruction, the criteria and requirements for the TBM become progressively more specific and detailed until therntunnel boring machine is delivered and launched. The Owner, Engineer, Contractor and Manufacturer all have thernability to weigh in on the TBM at different times along the project time line. Although the primary consideration forrnselection and design of the TBM is to handle the encountered ground conditions, there are other factors that influencernthe design and fabrication of the TBM.
机译:隧道掘进机(TBM)的要求在项目过程中不断发展。从计划到设计撕裂施工,TBM的标准和要求逐渐变得更加具体和详细,直到交付并启动隧道掘进机。业主,工程师,承包商和制造商都有权在整个项目时间表的不同时间权衡TBM。尽管TBM的选择和设计的主要考虑因素是处理遇到的地面条件,但是还有其他因素会影响TBM的设计和制造。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号