【24h】

HOW TO OBTAIN APPROVAL OF ALTERNATIVE METHODS

机译:如何获得替代方法的认可

获取原文
获取原文并翻译 | 示例

摘要

Building project submittal requirements of local and state jurisdictions can be a challenge, and they can significantly impact project schedules and budgets. This paper discusses submittal processes, the building code alternative methods, and recommendations for structural engineers and architects to overcome these challenges. The 7997 Uniform Building Code and the 2000 International Building Code provisions provide for alternatives to the code which allows design approaches that are not specifically addressed in the building code. Specific procedures must be followed to enable engineers and architects to obtain building officials approval of design documents so that building permits can be issued. The Internationa] Code Council published the ICC Performance Code for Buildings and Facilities in December 2001, which provides for more flexibility in meeting project objectives. Discussions will include engineers and architect's responsibilities, submittal requirements and application of this code when used in conjunction with current prescriptive codes and standards.
机译:建立地方和州司法管辖区的项目提交要求可能是一个挑战,并且可能严重影响项目进度和预算。本文讨论了提交流程,建筑规范的替代方法,以及为结构工程师和建筑师克服这些挑战的建议。 7997统一建筑规范和2000国际建筑规范的规定提供了替代规范,从而允许在建筑规范中未专门解决的设计方法。必须遵循特定的程序,以使工程师和建筑师能够获得建筑官员对设计文件的批准,以便可以颁发建筑许可证。国际规范委员会于2001年12月发布了《 ICC建筑物和设施性能规范》,该规范为实现项目目标提供了更大的灵活性。讨论将包括工程师和架构师的职责,提交要求以及本规范与当前规范性规范和标准结合使用时的应用。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号