Update of the Tarrant Regional Water District Eagle Mountain Connection Project

机译:塔兰特地区水区鹰山连接项目的更新

获取原文
获取原文并翻译 | 示例

摘要

Tarrant Regional Water District (TRWD) supplies raw water to over thirty wholesale customers (approximately 1.6 million people) in ten Texas counties. TRWD's existing raw water supply system includes two major reservoirs in East Texas, pipelines and pump stations to deliver water from East Texas to Tarrant County, the West Fork reservoirs, two terminal storage lakes in Tarrant County, and the Benbrook Connection, which delivers East Texas water to the southwest side of Fort Worth. The Eagle Mountain Connection Project will allow TRWD to pump water from their East Texas Reservoirs to Eagle Mountain Lake, which is one of the West Fork reservoirs. The $130-million project will allow TRWD to meet increasing demands in their West Fork service area and will result in power cost savings while increasing the available yield of the TRWD water supplies and the reliability of the TRWD system. The project includes 19 miles of 96-inch (244-cm) and 84-inch (213-cm) pipeline to connect TRWD's East Texas System to their West Fork System, two booster pump stations, a 120-million-gallon balancing reservoir, and a number of other required facilities. This paper presents a project update and lessons learned from the System Reliability and Enhancement Study, Pipeline Route Studies, Operational Study, and Preliminary Design Phases of the project. The project is currently in the Final Design Phase. Construction is scheduled to begin in May 2006.
机译:塔兰特地区水区(TRWD)向得克萨斯州10个县的30多个批发客户(约160万人)提供原水。 TRWD现有的原水供应系统包括东得克萨斯州的两个主要水库,将水从东得克萨斯州输送至塔兰特县的管道和泵站,西福克斯水库,塔兰特县的两个终端储水湖以及向东得克萨斯州输送水的本布鲁克河道。沃思堡西南侧的水。鹰山连接项目将允许TRWD将水从其东德克萨斯州水库抽水到西叉水库之一的鹰山湖。这项耗资1.3亿美元的项目将使TRWD能够满足其西叉服务区日益增长的需求,并节省电力成本,同时增加TRWD供水的可用产量和TRWD系统的可靠性。该项目包括19英里(96英寸(244厘米)和84英寸(213厘米)的管道,用于将TRWD的东德克萨斯系统连接到其西叉系统,两个增压泵站,一个1.2亿加仑的平衡水库,以及其他一些必需的设施。本文介绍了项目更新和从系统可靠性和增强研究,管道路线研究,运营研究以及项目的初步设计阶段中汲取的经验教训。该项目目前处于最终设计阶段。建设计划于2006年5月开始。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号