Energy Savings Upgrade of Air Systems at St. Regis Sudbrook Mill

机译:瑞吉苏德布鲁克工厂空气系统的节能升级

获取原文
获取原文并翻译 | 示例

摘要

This project was brought up because of the need of the customer to improve the total efficiency of the air systems related to the drying process of the paper machine. As in any project of this kind we started with a complete survey of the existing equipments to establish the present situations from which we would have to develop the new systems. In the first survey, we stated that the existing air systems had very poor heat recovery which meant there was a great potential for improvement. Of the three blowing groups into the dryer section only one of them had heat recovery while the other two were using steam to preheat the air with the consequent energy costs. Three other air to water heating units were present in the installation but out of use.
机译:提出该项目是因为客户需要提高与造纸机干燥过程相关的空气系统的总效率。像在任何此类项目中一样,我们从对现有设备的完整调查开始,以确定我们必须从中开发新系统的现状。在第一次调查中,我们指出,现有的空气系统的热回收非​​常差,这意味着有很大的改进潜力。在进入干燥机部分的三个吹风组中,只有一个具有热回收功能,而另外两个则使用蒸汽对空气进行预热,从而产生了能源成本。安装中还存在其他三个空气对水加热单元,但已停用。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号