【24h】

MODELING OFFICE BUILDINGS WITH DOE-2

机译:使用DOE-2对办公大楼进行建模

获取原文
获取原文并翻译 | 示例

摘要

DOE-2 is arguably the most complex andrncomprehensive building energy simulationrnprogram available. However, not even DOE-2rnaddresses ali situations encou ntered inrncommercial office buildings. Most buildingsrncontain one or more of the following situations:rno Heated and cooled by systems not availablernin simulation program.rnO Number of HVAC systems and/or zonesrnexceeds limits of simulation program. ArnMultiple chillers of different size andrnefficiencies. DOE-2 allows multiple chillers,rnbut does not allow assignment of chillers tornspecific systems.rnA New and irmovatíve HVAC controlrnsystems. Automatic room temperature andrnlighting controls found in new control systemrnspecifications exceed the limits of DOE-2 andrnrequire additional modeling assumptions.rnThis paper is an examination of these typicallyrnencountered problems and how they werernaddressed thru modeling studies performed overrnthe last three years. Case studies are used tornemphasize the problems. Modeling approachesrnused are presented and explained.rnNote that most of these problems will be solvedrnby the PowerDOE vcrsion of DOE-2, scheduledrnto be released in late 1995 (reference 1).
机译:DOE-2可以说是最复杂,最全面的建筑能耗模拟程序。但是,甚至DOE-2都没有解决其他情况,而使商业办公楼陷入困境。大多数建筑物都具有以下一种或多种情况:rno由模拟程序中未提供的系统加热和冷却。rnHVAC系统和/或区域的数量超出了模拟程序的限制。 Arn多台不同尺寸和效率的冷水机。 DOE-2允许使用多台冷水机,但不允许将冷水机分配给特定的系统。新的和不可移动的HVAC控制系统。在新的控制系统规格中发现的自动室温和照明控制超出了DOE-2的限制,并且需要其他建模假设。本文研究了这些典型遇到的问题,以及如何通过最近三年进行的建模研究来解决这些问题。通过案例研究来强调问题。提出并解释了所使用的建模方法。注意,大多数这些问题将通过DOE-2的PowerDOE版本解决,该版本计划于1995年底发布(参考文献1)。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号