首页> 外文会议>Proceedings of conference 31 >Skunk creek bank stabilization
【24h】

Skunk creek bank stabilization

机译:臭鼬溪银行稳定

获取原文
获取原文并翻译 | 示例

摘要

The greater Phoenix area is one of the fastest growing areas in the nation, with housing developments springing up all over the once barren desert Skunk Creek, a major flood control channel in maricopa County, flows through heavily populated areas. In the last decade bank stabilization has been required on all new housing developments along Skunk Creek, however, many predate this and have unprotected banks. Maricopa County Flood COntrol District decided it needed flood protection uup to the 100 year flood level, but didn't want a concerete channel, which attracts graffiti, or soil cement which is barren of all vegetation.
机译:大凤凰城地区是美国增长最快的地区之一,曾经荒芜的沙漠臭鼬溪(Maricopa县的主要防洪渠道)流向人口稠密的地区,房屋发展迅速兴起。在过去的十年中,Skunk Creek沿岸的所有新住房开发都需要银行稳定,但是,许多人早于此并且拥有不受保护的银行。 Maricopa县洪水控制区决定需要将洪水防护等级提高到100年洪水位,但不希望有一条会吸引涂鸦的露天通道,或者所有植被都贫瘠的土壤水泥。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号