FROM COMMISSIONING TO FIRST YEAR OPERATION OF A MODERN COAL FIRED 242 MW PLANT FACILITY

机译:从试运行到现代242兆瓦燃煤电厂设施的首次运行

获取原文
获取原文并翻译 | 示例

摘要

In this paper lessons learned during the period from commissioning the TS Power Plant to first year of commercial operations are discussed. It is hoped that the experience at TS Power Plant will be valuable to other new plants during the post-commissioning phase. In June 2008 the TS Power Plant commenced commercial operations. The plant is designed for a gross power output of 242 MW. Combustion takes place in a sub-critical B&W radiant boiler, which uses PRB coal for fuel to generate 1,491,000 lb/hr superheated steam at a design pressure and temperature of 2650 psi and 1055 °F respectively. The steam is used to drive a Toshiba reheat steam turbine generator set. To date the plant performance is better than expected. Actual HP turbine throttle pressures at desired load are less than design with a lower heat rate than expected. The plant has state of the art technology and follows strict emission removal standards in accordance with its air permit for the reduction of CO, NOX, SO_2, mercury and particulate matter. Plant personnel addressed problems ranging from mechanical, instrumentation and control, to freezing weather issues during the first year of operations. On several occasions the plant experienced forced outages and personnel had to troubleshoot in order to identify the root cause of the problems. The critical problems developed with the DCS, coal handling system, fans and air dampers, boiler combustion systems, steam turbine auxiliaries, selective catalytic reduction system, spray dry absorber, and water treatment. A significant number of the problems were carried over from facility commissioning and new ones developed during normal operations. Plant personnel had to work through these problems on a daily basis. The operating staff had gained significant experience during the plant commissioning phase by participating in loop shooting and equipment commissioning. It is also important to note that operations staff completed a General Physics training program designed specifically around the TS Power plant systems during construction. The plant was running relatively smoothly with an average availability of 99.84% for the last three months of2008.
机译:本文讨论了从TS电厂投产到商业运营第一年期间的经验教训。希望TS发电厂的经验将在调试后的阶段对其他新电厂有价值。 TS发电厂于2008年6月开始商业运营。该电厂的设计总功率为242兆瓦。燃烧发生在亚临界B&W辐射锅炉中,该锅炉使用PRB煤作为燃料,分别在设计压力和2650 psi和1055°F的温度下产生1,491,000 lb / hr的过热蒸汽。蒸汽用于驱动东芝再热蒸汽涡轮发电机组。迄今为止,该工厂的性能好于预期。所需负载下的实际HP涡轮节气门压力低于设计,且热量率低于预期。该工厂采用最先进的技术,并按照严格的排放标准执行其空气排放许可,以减少CO,NOX,SO_2,汞和颗粒物的排放。在运营的第一年中,工厂人员处理了从机械,仪表和控制到冻结天气的问题。在几次情况下,工厂都遇到了强制停机的情况,因此必须对人员进行故障排除,以找出问题的根本原因。 DCS,煤炭处理系统,风扇和空气挡板,锅炉燃烧系统,汽轮机辅助设备,选择性催化还原系统,喷雾干燥吸收器和水处理技术产生了关键问题。大量的问题从设备调试中转移出来,并在正常运行期间开发了新的问题。工厂人员必须每天解决这些问题。在工厂调试阶段,操作人员通过参与回路拍摄和设备调试获得了丰富的经验。还需要注意的是,运营人员在施工期间完成了专门针对TS电厂系统设计的通用物理培训计划。该工厂运行相对平稳,2008年最后三个月的平均利用率为99.84%。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号