首页> 外文会议>Proceedings of the Twentieth international conference on automated planning and scheduling >Construction Management Applications: Challenges in Developing Execution Control Plans
【24h】

Construction Management Applications: Challenges in Developing Execution Control Plans

机译:施工管理应用程序:制定执行控制计划的挑战

获取原文
获取原文并翻译 | 示例

摘要

The objective of automated planners is to synthesize sequences of actions (called policies in MDP frameworks) that will achieve a predetermined goal given a fully or partially observable formal representation of the domain. In contrast, the main characteristic of project management is the greater emphasis on plan execution under uncertainty as opposed to plan synthesis. This paper explains the need to transition from automated plan synthesis to plan management and identifies the challenges for the planning and scheduling communities using examples of construction projects.
机译:自动计划者的目标是综合一系列动作(在MDP框架中称为策略),这些动作序列将在给定完整或部分可观察到的域正式表示的情况下实现预定目标。相比之下,项目管理的主要特征是更加强调在不确定性下的计划执行,而不是计划综合。本文解释了从自动化计划综合过渡到计划管理的必要性,并使用建筑项目的实例来确定规划和进度安排社区面临的挑战。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号