The Sound Transit Northgate Link Contract N125 Project includes 5.6 km of twin subwayrntunnels in the northern end of the City of Seattle, WA, USA. This project includesrnthe excavations for two underground stations, as well as the excavation and final concreternlining for the twin tunnels, 23 cross passages, and a portal. Jay Dee Contractors,rnInc., Frank Coluccio Construction Company, and Michels Corp. formed an LLC (JCM)rnfor the construction of this project. The tunnels are expected to be driven with 2 refurbishedrnTBMs, one of which was previously used by JCM on an earlier Sound TransitrnProject, while the other was previously used on a project in Singapore. A third TBM isrnbeing refurbished as a standby machine to be used if problems are encountered onrneither of the initial two TBMs. This paper summarizes the preparation work that hasrnbeen done prior to starting the major tunneling work on the project, including the refurbishmentrnof the initial two TBMs.
机译:诺斯盖特地铁N125声响合同N125项目包括位于美国华盛顿州西雅图市北端的5.6公里双地铁隧道。该项目包括两个地下车站的开挖,以及双隧道,23个交叉通道和一个门户的开挖和最终混凝土衬砌。 Jay Dee Contractors,rnInc。,Frank Coluccio Construction Company和Michels Corp.组建了LLC(JCM)rn进行该项目的建设。隧道预计将由2条翻新的TBM驱动,其中一个曾由JCM在较早的Sound TransitrnProject上使用,而另一个则曾在新加坡的一个项目上使用。如果最初的两个TBM中的任何一个遇到问题,则将翻新第三个TBM作为备用机器以使用。本文总结了在开始该项目的主要隧道工作之前已经进行的准备工作,包括对最初的两个TBM进行翻新。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号