首页> 外文会议>(Re)Claiming the Underground Space >Sophiaspoortunnel - tunnel technique and development of the continuous advance method
【24h】

Sophiaspoortunnel - tunnel technique and development of the continuous advance method

机译:裂洞隧道技术及其连续推进方法的发展

获取原文
获取原文并翻译 | 示例

摘要

Developments in mechanised tunnelling have increased within the last few years and captured the attention of the public sector. The stage of development depends on growing global demands concerning the extension of the infrastructure facilities like traffic concept, supply routes and wastewater disposal. One basic step forward regarding the extension of know-how and innovation on the sector of mechanised shield tunnelling, is the tunnel boring machine which was used for the construction of the Sophiaspoortunnel in the Netherlands. A Mixshield with liquid supported tunnel face which is characterised by a continuous advance method. This paper describes the project, the development and the basic characteristics of the continuous advance method for soft ground TBMs.
机译:在过去的几年中,机械化隧道的发展有所增加,并引起了公共部门的关注。发展阶段取决于全球对基础设施扩展的需求,例如交通概念,供应路线和废水处理。在机械化盾构隧道技术领域扩展专业知识和创新的一个基本步骤是在荷兰建造Sophiaspoortunnel的隧道掘进机。带有液体支撑隧道面的混合盾构,其特征在于连续推进方法。本文介绍了软土地基掘进机连续推进方法的项目,发展及基本特点。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号