首页> 外文会议>Sustainable irrigation and drainage IV: Management, technologies and policies >Developing an asset management plan for a sustainable future Indonesia irrigation systems
【24h】

Developing an asset management plan for a sustainable future Indonesia irrigation systems

机译:为未来可持续的印度尼西亚灌溉系统制定资产管理计划

获取原文
获取原文并翻译 | 示例

摘要

Since irrigation systems in Indonesia are faced with the problem of performance and sustainability, especially in rural areas, it is imperative to implement a sustainable and cost-effective Asset Management Plan (AMP). This AMP enables irrigation authorities to utilize and maintain the condition of its assets in the best possible way; to be kept running at a good operating standard, and provide a level of service that is consistent with cost-effectiveness and sustainability objectives. The AMP framework was developed by integrating several methods. Initially, system performance was assessed through the internationally accepted method of Rapid Appraisal Procedure (RAP) and farmers' opinion survey. This combination was chosen to provide a more in-depth assessment by analysing the farmers' preferences so that the AMP framework can be developed with the elements to increase local support, co-operation, and benefit. Then, it was analysed further by adopting the Triple Bottom Line (TBL) principle to develop a sustainability framework. Finally, the AMP framework was built by utilising a modification of the method proposed by the Institute of Irrigation Studies (IIS) -University of Southampton and a participatory process in setting the level of service and timeframe of implementation. Performance of rural irrigation systems is generally poor. However, the farmers are quite satisfied with the current services yet they expect improvement in the future. The TBL framework indicates that the systems to be sustained require modernisation of the irrigation systems and better irrigation system management, procedures, and communication by improving participation in irrigation management. Eventually, the AMP framework incorporate Water User Associations (WUAs) to make more efficient use of irrigation water and cost-effectiveness in maintaining the assets, especially at a tertiary level.
机译:由于印度尼西亚的灌溉系统面临性能和可持续性的问题,特别是在农村地区,因此必须实施可持续且具有成本效益的资产管理计划(AMP)。该AMP使灌溉当局能够以最佳方式利用和维护其资产状况;保持良好的运营标准运行,并提供符合成本效益和可持续性目标的服务水平。 AMP框架是通过集成几种方法开发的。最初,系统性能是通过国际认可的快速评估程序(RAP)和农民意见调查来评估的。选择此组合可通过分析农民的喜好来提供更深入的评估,从而可以使用增加本地支持,合作和收益的要素来开发AMP框架。然后,通过采用三重底线(TBL)原理来建立可持续性框架,对其进行了进一步分析。最后,通过对南安普顿大学灌溉研究所(IIS)提出的方法进行修改,并通过参与过程来确定服务水平和实施时间表,来构建AMP框架。农村灌溉系统的性能普遍较差。但是,农民对当前的服务非常满意,但他们希望将来会有所改善。 TBL框架表明,要维持的系统需要对灌溉系统进行现代化改造,并通过改善对灌溉管理的参与来改善灌溉系统的管理,程序和沟通。最终,AMP框架合并了用水户协会(WUA),以更有效地利用灌溉水和成本效益来维护资产,尤其是在第三级。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号