COMMISSIONING THE PORT KEMBLA COPPER SMELTER

机译:调试金伯拉铜冶炼厂

获取原文
获取原文并翻译 | 示例

摘要

The Port Kembla Copper (PKC) copper smelting facilities were commissioned during 2000. Numerous difficulties were encountered during the commissioning such as multiple reactor tuyere line failures, absorbing acid tower refractory collapse, and Noranda Reactor and Mitsubishi Converter process control problems. These problems are described along with the actions taken to overcome them. Process development is described particularly for the Mitsubishi Converter and Acid Plant.
机译:Port Kembla铜(PKC)铜冶炼设施于2000年投入运行。调试期间遇到了许多困难,例如多反应堆风口管线故障,吸收酸塔耐火材料坍塌以及Noranda反应堆和三菱转炉的过程控制问题。描述了这些问题以及为克服这些问题所采取的措施。特别介绍了三菱转炉和酸厂的工艺开发。