DAM SAFETY ISSUES AND REMEDIAL WORKS AT CANNING DAM IN WESTERN AUSTRALIA

机译:西澳大利亚坎宁坝的水坝安全问题和补救措施

获取原文
获取原文并翻译 | 示例

摘要

Canning Dam is a 70 m high, 355 m long curved concrete gravity structure with an ogee-shaped spillway of 109 m length. It is located on the Canning River approximately 34 km south east of Perth in Western Australia. Constructed between 1933 and 1940, the dam impounds a maximum storage of 90.4 million m~3 and is a primary peaking water-supply source for Perth. Canning Dam is categorised as an "extreme hazard" structure as the implications of failure are significant with a population at risk in excess of 100 000. A comprehensive dam safety review undertaken in 1996 concluded that the existing dam does not possess adequate margins of safety with respect to strength and stability required according to modern standards. In addition, the studies confirmed that the dam was suffering from alkali aggregate reactivity (AAR). A thorough investigation of crack mapping revealed the existence of a predominant crack pattern following construction lift joints. Subsequent Option studies for strengthening the dam concluded that the installation of high-capacity post-tensioned anchors as the best means of strengthening the dam. The maximum capacity anchor used consists of 91 extra high tensile strength strands of 15.2mm in diameter: The anchor minimum breaking load (MBL) is 23 751 kN. To the best of the Authors' knowledge, these anchors to be used in Canning Dam are the largest capacity permanent ground anchors ever used worldwide in this type of application.
机译:坎宁大坝是一座高70 m,长355 m的弯曲混凝土重力结构,具有109 m长的鹅卵形溢洪道。它位于西澳大利亚珀斯东南约34公里处的坎宁河上。该大坝建于1933年至1940年之间,最大蓄水量为9040万立方米,是珀斯的主要峰值供水源。坎宁大坝被归类为“极端危险”结构,因为其破坏的影响是巨大的,其人口风险超过10万。1996年进行的大坝安全性全面审查得出的结论是,现有大坝没有足够的安全裕度。符合现代标准要求的强度和稳定性。此外,研究证实大坝正在遭受碱骨料反应性(AAR)。对裂缝图的彻底调查显示,施工升降缝后存在主要的裂缝模式。随后的关于加固大坝的Option研究得出的结论是,安装大容量后张锚是加固大坝的最佳方法。所使用的最大承载力包括91条直径为15.2mm的超高抗拉强度绞线:锚固的最小断裂载荷(MBL)为23 751 kN。据作者所知,这些在坎宁大坝中使用的锚是全球有史以来在此类应用中使用的最大容量的永久地锚。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号