EXPECTING THE BEST AND PREPARING FOR THE WORST: EARLY NEUTRALIZATION AND CLAIM AVOIDANCE IN DREDGING MARINE CONSTRUCTION

机译:期待最好并为最坏做好准备:挖泥和海洋工程中的早期中和和避免索赔

获取原文
获取原文并翻译 | 示例

摘要

Dredging has unique qualities in the marine construction environment in as much as the owner, design professional, and contractor rely heavily on technology and engineering to determine how best to execute the project, such that the end result is in keeping with the parties' expectations and the project is considered successful by all parties of interest. In fact many dredging and marine construction projects offer unique challenges in contrast to most conventional terrestrial construction as data acquisition, interpolation and natural phenomena create conditions that many times affect the project and its success. Disputes may, and often do, arise from conception through construction completion. The methods, manner and dynamics of how the parties interact in the dispute process is critical to the overall outcome of the project both from a performance and financial aspect. This subject is to be explored by comparing and contrasting two projects (although based in fact, the projects and parties have been masked), each with issues that arose during construction and exploring how these components interplay with one another. Each case will provide a brief synopsis of the facts, then a discussion of the issues and finally within each case methods that may be engaged to strengthen positions, and come to a final strategy on the best alternatives.
机译:船东,设计专业人员和承包商在很大程度上依赖技术和工程来确定如何最好地执行该项目,从而使最终结果与各方的期望和有关各方认为该项目是成功的。实际上,与大多数传统的陆地建设相比,许多疏and和海洋建设项目都面临着独特的挑战,因为数据采集,插值和自然现象创造了许多次会影响该项目及其成功的条件。争议可能而且通常确实是从构思到施工完成而引起的。双方在争端过程中如何互动的方法,方式和动力,从绩效和财务角度而言,对于项目的总体成果至关重要。通过比较和对比两个项目(尽管实际上基于项目和参与方已被掩盖),可以探索该主题,每个项目都具有在构建过程中出现的问题,并探讨这些组件之间如何相互作用。每个案例都将提供一个简短的事实简介,然后是对问题的讨论,最后是每个案例中可以用来加强立场的方法,并就最佳选择提出最终策略。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号