Construction Practice of CFRD of Upper ReserVoir of Yixing Pumped-storage Power Plant

机译:宜兴抽水蓄能电站上水库CFRD施工实践

获取原文

摘要

The main dam of the upper reservoir of Yixing Pumped-storage Power Plant, as areinforced concrete faced rock-filled dam built on the tilted foundation surface, is rare at homeand abroad in its type whose stress and deformation traits are in accordance with the general law. The deformation of upper reservoir of the main dam of Yixing Pumped-storage Power plant issmaller in all CFRD in China, and the amount of the impervious faceplate cracks is less than thatof the same type project, it shows that the design of main dam is reasonable and advanced, andthe construction is high quality.
机译:宜兴抽水蓄能电站上水库主坝是在倾斜的地基上建的钢筋混凝土面板堆石坝,其应力和变形特性符合一般规律,在国内外尚属罕见。 。在全国所有CFRD中,宜兴抽水蓄能电站主坝上部水库变形较小,不透水面板裂缝的数量少于同类型工程,表明主坝设计合理。先进,施工质量高。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号