首页> 外文会议>2007年中国高坝关键技术交流会(Workshop on High Dam Know-How 2007 China) >Brief Introduction to Sand-gravel Dam Seepage Control Construction Technologies for Xixiayuan Counter Reservoir with Inclined Compound Geomembrane Core
【24h】

Brief Introduction to Sand-gravel Dam Seepage Control Construction Technologies for Xixiayuan Counter Reservoir with Inclined Compound Geomembrane Core

机译:斜下复合土工膜芯西峡苑逆水库砂石坝防渗施工技术简介

获取原文

摘要

1 Project BriefThe Xixiayuan Counter Reservoir is located on the mainstream of the Yellow River in HenanProvince, 16km downstream of Xiaolangdi Multipurpose Dam Project, with a total catchmentarea of 694,600km2 above the dam site. This is a large-sized multipurpose dam project mainlyfor counter regulation, but also for power generation, water supply and irrigation, with a totalstorage capacity of 162 million m3, a maximum height of 20.2m in the sand-gravel section and51.5m in the concrete section, a total installed capacity of 140MW, and an irrigation area of1.138 million mu.
机译:1项目简介西峡园逆流水库位于河南省黄河干流,小浪底多功能水坝工程下游16公里处,总蓄水面积为694,600平方公里。这是一个大型多用途大坝工程,主要用于反调节,也用于发电,供水和灌溉,总存储容量为1.62亿立方米,砂砾段最大高度为20.2m,砂砾段最大高度为51.5m。混凝土部分,总装机容量140MW,灌溉面积113.8万亩。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号