BASE ISOLATION RETROFIT WORK THAT CAN BE DONE 'WHILE ABUILDING IS BEING OCCUPIED' AND SUBSEQUENT LARGE-SCALEADDITIONS CONSTRUCTED INSIDE THE BUILDING

机译:可以进行“在建筑物被占用时”进行基本隔离改造,并在建筑物内部构造后续的大型附加件

获取原文

摘要

With the end of the period of high economic growth, it is predicted that construction investmentwill shift away from new projects towards stock maintenance. At the same time, the transition ofthe economy from one based on production of material goods to one based on information isincreasing the importance of 'smart buildings.' Buildings that contain sophisticated informationequipment require a very high degree of seismic resistance; thus, demand is increasing everyyear for improving methods and technologies for reinforcing the earthquake resistance ofexisting buildings by base isolation.In this condition the work of PhaseⅠwas done. This was base isolation retrofit work. And thetotal aria was 682178.7m2. The base isolated structure is connected structure by the fourbuildings. Each building was constructed from 1973 to 1985. And every building is SRCstructure. When we made this base isolated structure we use 264 numbers of natural rubberbearings and 28 wall-type viscous dampers.After that, work started on Phase II. This involved the construction of a 4725.7m2 addition ofsteel structure, bringing the total area of base isolated buildings to 72,472.9 m2. For this purpose,additional 8 rubber bearings and 4 wall-type viscous dampers were installed. Eventually, therewere 272 rubber bearings and 32 wall-type viscous dampers. Most of the addition work wasfinished by the end of 2003. Presently, minor structures are being constructed on the roof. Whenthey are finished, which should be sometime in 2005, the project will be completed.
机译:随着经济高速增长期的结束,预计建设投资将从新项目转向库存维护。同时,经济从一种基于物质产品的生产向基于信息的经济的转变,增加了“智能建筑”的重要性。包含复杂信息设备的建筑物需要很高的抗震能力;因此,对通过隔震来增强既有建筑物的抗震能力的方法和技术的需求每年都在增加。在这种条件下,完成了第一阶段的工作。这是基础隔离改造工作。总的咏叹调为682178.7m2。基础隔离结构是由四个建筑物相连的结构。每栋建筑建于1973年至1985年。每栋建筑均为SRCstructure。当我们制作这种基础隔离结构时,我们使用了264种天然橡胶轴承和28种壁式粘性阻尼器,然后开始进行第二阶段的工作。这涉及增加4725.7m2的钢结构,使基础孤立建筑物的总面积达到72,472.9 m2。为此,另外安装了8个橡胶轴承和4个壁式粘性阻尼器。最终,有272个橡胶轴承和32个壁式粘性阻尼器。大部分加建工程已于2003年底完成。目前,屋顶上正在建造较小的结构。当它们完成时(应该在2005年的某个时候),该项目将完成。

著录项

  • 来源
  • 会议地点 Vancouver(CA);Vancouver(CA)
  • 作者单位

    Structure Section Building Design Department Takenaka Corporation Tokyo 104-8182 JAPAN E-mail: miyake.hiraku@takenaka.co.jp;

    Structure Section Building Design Department Takenaka Corporation Tokyo 104-8182 JAPAN E-mail: ohtani.kei@takenaka.co.jp;

    Structure Section Building Design Department Takenaka Corporation;

    Advanced Structure Section Takenaka Research & Development Institute 1-5-1 Inzai-shi Chiba 270-1395 JAPAN E-mail: higashino.masahiko@takenaka.co.jp;

    Takenaka Corporation office of Design management;

  • 会议组织
  • 原文格式 PDF
  • 正文语种
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号