首页> 外文会议>World energy engineering congress and high performance facilities expo 2004 (WEEC 2004) >CONTINUOUS COMMISSIONING OF SALT LAKE COMMUNITY COLLEGESOUTH CITY CAMPUS
【24h】

CONTINUOUS COMMISSIONING OF SALT LAKE COMMUNITY COLLEGESOUTH CITY CAMPUS

机译:盐湖社区学院连续试修南城校区

获取原文
获取原文并翻译 | 示例

摘要

The State of Utah’s Department of Natural Resourcesrnfunded two projects in Salt Lake City to demonstrate thernfeasibility of the Continuous Commissioningrn? (CC ?)1rnprocess. The two sites selected were a modern staternbuilding, the Matheson Courthouse [1], and a very oldrnbuilding, the South City campus of Salt Lake CommunityrnCollege. This paper describes the measures and savingsrnresults from the CCrn? process at the Community College.rnThe energy savings amounted to 15% of the annual utilityrnbill. While most of the savings were attributed to CC, partrnwas attributed to the on-site facility operators whornimplemented measures over and above those recommendedrnby the CC engineers. It was an exciting team effort and arngood example of the savings that can be achieved by CCrnengineers working closely with a good facility operationsrnstaff.
机译:犹他州自然资源部资助了盐湖城的两个项目,以证明连续调试的可行性。 (CC?)1rn过程。选择的两个地点是一座现代化的州立建筑,Matheson Courthouse [1],以及一座非常古老的建筑,盐湖社区学院的南部城市校园。本文介绍了CCrn?的措施和节省的结果。节约的能源相当于年度公用事业账单的15%。虽然大部分节省是由于CC,但是一部分归因于现场设备操作员,他们实施的措施超出了CC工程师的建议。这是一个令人兴奋的团队努力,并且是CCrnengineers与良好的设施运营人员紧密合作可以实现的节省的一个很好的例子。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号