A simulation-based analysis of concurrent engineering applications in the architecture, engineering and construction industry.

机译:基于仿真的建筑,工程和建筑行业中并行工程应用分析。

获取原文
获取原文并翻译 | 示例

摘要

The ultimate goal for all AEC project planners is to deliver projects "on time and on budget." Accordingly, finishing a project ahead of schedule would be one way to exhibit exemplary performance and exceed expectations. Ahead of schedule completion would also have a positive effect on reducing the budget, due to the fact that reduction in project time leads to a reduction in overhead costs and there may be financial incentives in the contract for early completion. One method to reduce project delivery time is to employ concurrent engineering strategies by overlapping normally sequential, dependent design activities. The success or failure of the overlapping process depends on the characteristics of the activities, the overlap strategy and the degree of overlap employed. The primary objective of this study is to extend previous research dealing with the application of concurrent engineering principles to the AEC industry.; The major contribution of this thesis is the creation of a computer based simulation model utilizing the GoldSimRTM software package. The model provides a means by which various combinations of activity pair characteristics and activity durations can be tested to determine the optimum combination of degrees of overlap and overlap strategies for each activity pair. The optimum solution could be one in which the design cost or project cost is minimized, given a financial incentive for finishing the project ahead of schedule. The model also has the capability to serve as a pseudo-laboratory in which assumptions and input modifications can be tested and analyzed.; A second contribution arises from studying the results of hundreds of simulation model runs. Several significant trends have become apparent. These trends can be used to establish rules of thumb for construction project planners who are seeking to reduce their project delivery times. While this is a secondary result of the research, it may prove to be the most important contribution to the current body of knowledge dealing with concurrent engineering in the Architecture, Engineering and Construction industry. Suggestions for future research are also provided.
机译:所有AEC项目规划人员的最终目标是“按时且按预算”交付项目。因此,提前完成项目将是展现典范性能并超出预期的一种方法。提前完成计划也将对减少预算产生积极影响,原因是项目时间的减少导致间接费用的减少,并且合同中可能有财务诱因提早完成。减少项目交付时间的一种方法是通过重叠通常依序进行的相关设计活动来采用并行工程策略。重叠过程的成功或失败取决于活动的特征,重叠策略和所采用的重叠程度。这项研究的主要目的是将先前有关并行工程原理应用的研究扩展到AEC行业。本文的主要贡献是利用GoldSimRTM软件包创建了基于计算机的仿真模型。该模型提供了一种手段,通过该手段可以测试活动对特征和活动持续时间的各种组合,以确定每个活动对的重叠程度和重叠策略的最佳组合。最佳的解决方案可以是将设计成本或项目成本降到最低的解决方案,前提是有财务动机鼓励提前完成项目。该模型还具有充当伪实验室的能力,在其中可以测试和分析假设和输入修改。研究数百个仿真模型运行的结果产生了第二个贡献。几个明显的趋势已经变得明显。这些趋势可用于为寻求减少项目交付时间的建筑项目计划者建立经验法则。尽管这是研究​​的第二结果,但它可能被证明是对建筑,工程和建筑行业中的并行工程知识的最重要贡献。还提供了未来研究的建议。

著录项

  • 作者

    Coker, Jason George.;

  • 作者单位

    University of Colorado at Boulder.$bCivil Engineering.;

  • 授予单位 University of Colorado at Boulder.$bCivil Engineering.;
  • 学科 Engineering Civil.
  • 学位 M.S.
  • 年度 2007
  • 页码 140 p.
  • 总页数 140
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 建筑科学;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号