Evaluating the preconstruction phase in a Construction Manager/General Contractor project.

机译:在施工经理/总承包商项目中评估施工前阶段。

获取原文
获取原文并翻译 | 示例

摘要

The Construction Manager/General Contractor (CMGC) project delivery method is an alternative delivery concept that many state highway agencies are interested in using in an effort to improve the deteriorating infrastructure in the United States. The CMGC method is encouraged by the Federal Highway Administration through the Every Day Counts 2 initiative which encourages "better, faster, and smarter" construction. However, many state agencies are just now obtaining the legal authority to use CMGC in their respective states. The main difference between the CMGC method and the traditional method of delivering projects is that the contractor is involved during the preconstruction phase. The main focus of this research is the preconstruction phase of the CMGC delivery method through three research objectives.;First, an agency must want to use the CMGC method to deliver construction projects. Research on the benefits and challenges of implementing the method was conducted to give agencies the knowledge of the process to determine why they should implement the CMGC method into their program. Second, once an agency has decided to use the CMGC method, they need to determine the preconstruction services which will be required of the CMGC contractor during the preconstruction phase. Finally, research was performed for the first time on using an Independent Cost Estimate (ICE) consultant during preconstruction to validate the prices given to the agency by the CMGC contractor and to determine the extent to which the ICE consultant adds value to the CMGC process. Research for this thesis was performed using literature review, content analysis of presentations and solicitation documents, and case studies.;This research found that the main benefit of the CMGC process was the ability to achieve accelerated design and construction schedules and the main challenge was training agency personnel to provide the necessary support to achieve that goal. Furthermore, highway and non-highway agencies alike, find that the design-related and cost-related aspects of the CMGC preconstruction phase add the most value to the process. Finally, it was determined that even though the agency incurs an added cost by involving an ICE consultant, the value added to the project by the knowledge brought by the ICE consultant outweighs the added cost.
机译:施工经理/总承包商(CMGC)项目交付方法是另一种交付概念,许多州高速公路机构都对使用这种交付概念感兴趣,以改善美国不断恶化的基础设施。联邦公路管理局通过“每天计数2”计划鼓励使用CMGC方法,该计划鼓励“更好,更快,更智能”的建设。但是,许多州机构刚刚获得在各自州使用CMGC的合法权限。 CMGC方法与传统的交付项目方法之间的主要区别在于,承包商在施工前阶段就参与其中。这项研究的主要重点是通过三个研究目标完成CMGC交付方法的预建阶段。首先,一个机构必须要使用CMGC交付项目。进行了关于实施该方法的好处和挑战的研究,以使代理机构了解该过程的知识,以确定为什么应在其程序中实施CMGC方法。其次,一旦某个机构决定使用CMGC方法,他们需要确定CMGC承包商在施工前阶段所需的施工前服务。最后,首次进行了关于在施工前使用独立成本估算(ICE)顾问的研究,以验证CMGC承包商向代理商提供的价格,并确定ICE顾问在CMGC流程中增加价值的程度。本论文的研究是通过文献综述,演讲内容和招标文件的内容分析以及案例研究进行的;该研究发现,CMGC工艺的主要好处是能够加快设计和施工进度,而主要挑战是培训代理商人员提供必要的支持以实现该目标。此外,高速公路和非高速公路机构都发现,CMGC预制阶段的设计相关和成本相关方面为该过程增加了最大价值。最后,可以确定的是,即使该机构通过聘请ICE顾问而增加了成本,但ICE顾问带来的知识为项目增加的价值却超过了所增加的成本。

著录项

  • 作者

    Schierholz, Jeanna Marie.;

  • 作者单位

    Iowa State University.;

  • 授予单位 Iowa State University.;
  • 学科 Engineering Civil.
  • 学位 M.S.
  • 年度 2012
  • 页码 241 p.
  • 总页数 241
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号