首页> 中文期刊> 《建筑技术》 >大跨度井格梁屋盖高支模施工技术

大跨度井格梁屋盖高支模施工技术

         

摘要

南京造币厂行业备件中心立体仓库高跨井格梁屋盖工程,按照制订的高跨扣件式落地钢管排架满堂支撑专项施工方案施工,上部井格梁屋盖混凝土一次性浇筑完毕,排架支撑模板按规定拆除,施工中未发生安全事故,经专家组的检查和最终验收,排架整体稳定可靠,符合设计及规范要求,为今后施工同类型结构工程积累了经验.%The high span cross beam roof engineering of Stereoscopic Warehouse of Industry Spare Parts Center of Nanjing Mint Co., Ltd. Is carried out according to the special construction scheme of supporting by full-house high span fastener type ground steel pipe frame bent. One-off concrete pouring is adopted for top cross beam roof and the frame supporting formworks are dismantled in accordance with the provisions. No safety accident happened during the construction. After inspection and final acceptance by the expert group, the frame bent is stable and reliable, satisfying the design requirements and the requirements of codes. Experiences are accumulated for construction of similar structural works in the future.

著录项

相似文献

  • 中文文献
  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号