首页> 中文期刊> 《中国港湾建设》 >港珠澳大桥工程环境保护措施及效果分析

港珠澳大桥工程环境保护措施及效果分析

         

摘要

分析了港珠澳大桥施工期主要污染因素,阐述了中国交建在施工过程中采取的有针对性的控制措施,通过对比历年海洋环境监测与评价报告中对于海水水质检验的数据,表明采取这些措施所产生的良好效果。研究表明,跨海大桥施工必然会对环境造成一定影响,但只要提高环保意识,采取有效措施,就能够把影响控制在可接受范围,运营期间也是如此。%This paper analyzes the main pollution factors during the construction period of the Hongkong-Zhuhai-Macao Bridge( HZMB ), expounds the targeted control measures that CCCC has taken during the construction period. By comparing the monitoring results of marine environment over the years and the evaluation report of seawater quality inspection data, these mea-sures have received good effect. The results show that the cross-sea bridge constructions cause certain impacts on environment inevitably. However, these impacts can be minimized as long as we heighten the environmental awareness and take effective measures. It also applies during the operation period.

著录项

相似文献

  • 中文文献
  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号