In this paper, daily production scheduling is studied based on the Third Steelmaking Plant of Wuhan Iron and steel corporation (WISCO). To make sure the daily production plan is feasible, method of casting gToup is established, and the compatibility between two converters and three continuous casting devices in the Third Steelmaking Plant of WISCO is analyzed. The process flow chart of daily production scheduling is given in this paper. Then, algorithms and procedures for the simulation of daily production plan is developed. Using the actual data from the Third Steelmaking Plant, the feasible daily steelmaking plan and cast plan are given. The plan contains 7 groups of cast plan, figured out 54 converters, and a- bout 13,500 tons steel.
展开▼
机译:Study on Risk Management of Epidemic Prevention in High Rise Residential Areas of Urban Community from the Perspective of COVlD-19: A Case Study of L Community in Handan City
机译:Qualitative and Comparative Study of Different Methods of Interpolation for the Mapping of Groundwater Salinity: Case Study of Thermal Waters Used for Irrigation in Northeastern Algeria
机译:如何发展银行品牌形象-以专注于财富管理业务的远东国际商业银行为例 =The Study of the Development of Bank’s Brand Image- A Case Study of Far Eastern Int’l Bank Targeting on Wealth Management