Yueyufeng No.3 blast furnace blew in after a medium maintenance in April , 2009.It was blown out 11 months later for both its insufficient production capacity and market reasons in March , 2010.It was blown in again on April 11, 2011, along with the operation of Yueyufeng sintering phase II (132m2).The nominal air quantity was reached, and the design capacity was achieved after 3 days and full capacity was reached after 6 days of blowing in .%粤裕丰3号高炉在2009年4月中修开炉后,因市场原因及烧结产能不够,生产11个月后于2010年3月封炉,随着粤裕丰烧结2期的投产(132 m2),公司决定于2011年4月11日3号高炉开炉,送风后,3天开全风口,4天开始喷煤,6天顺利达产。