首页> 中文期刊> 《公路工程》 >上海大直径盾构隧道施工引起地表沉降研究

上海大直径盾构隧道施工引起地表沉降研究

         

摘要

Shanghai rising demand for large diameter tunnel,how to minimize the tunnel construc-tion the effects on the environment has become a hot research topic.Outside diameter of 13.95 m wel-come three road tunnel as an example,by empirical formula,and field measurement,research on tunnel subsidence under the condition of sensitive area and bad geological condition,caused by surface deforma-tion control of shield tunnel.Empirical formula and field observations show that the regional volume loss should be controlled within 0.2%,ensures maximum ground settlement is less than 10mm;Besides vol-ume loss in 0.81 % of the time,the settlement trough width coefficient of predicted values and measured values are not have good consistency,when I =Z0 to fitting the data obtained from the tunnel excavation process,the parameters within the range of 0.31 to 0.37,lower than the small and medium-sized tunnel suggest a value of 0.5,research results to provide a reference for the related engineering.%上海对于大直径隧道的需求不断增长,如何最大限度降低隧道施工对环境造成的影响已成为研究热点。以外直径为13.95 m 的迎宾三路隧道为例,采用经验公式计算,并进行现场实测,研究在隧道穿越沉降敏感区和不良地质条件的情况下,由盾构隧道引起的地表变形控制。经验公式和实地观察表明,该区域体积损失应被控制在0.2%以内,可保证地表最大沉降量不超过10 mm;除容积损失在0.81%的情况外,沉降槽宽度系数预测值与测量值不具有较好的一致性,当用 i =Z0去拟合隧道开挖过程中获得的数据,参数 a 在0.31~0.37区间,低于中小隧道建议值0.5,研究成果可供相关工程参考。

著录项

相似文献

  • 中文文献
  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号