针对毕节煤化工一体化项目在建设施工期及自然恢复期的水土流失问题,采用调查分析法,在现场勘测和分析相关资料、文件的基础上,预测了该项目在建设施工期及自然恢复期可能造成的新增水土流失量,预测结果为合理布设该项目水土保持与生态修复措施提供了科学依据和技术支撑.%In view of the existing problems of soil and water loss in the construction and natural recovery stages of Bijie coal chemical integration project, the possible increased amount of soil and water loss in the construction and natural recovery stages of this project was predicted by way of survey analysis method based on site survey and the analyses of related data and documents. The results of predication could provide a scientific foundation and technical supports for rational implementation of the measures for soil and water conservation and ecological restoration of Bijie coal chemical integration project.
展开▼