首页> 中文期刊> 《水利与建筑工程学报》 >黔中水利枢纽平寨水库左岸岩溶溶蚀分析

黔中水利枢纽平寨水库左岸岩溶溶蚀分析

         

摘要

Affected by the lithology and structure ,the karst on the left bank of Pingzhai Reservoir have developed five layers of karst system .Based on the information investigation for the grouting tunnels with anti-seepage curtain ,the quan-titative analyses were performed about the karst corrosion characteristics and karst developing regularity .The conclusion is that the karst corrosion would gradually strengthen from up to down in the vertical direction ,and gradually strengthen from off-river to near-river direction .Simultaneously there exist some centralized corrosion regions which are controlled by the formation lithology and geological structure .%黔中水利枢纽平寨水库大坝左岸岩溶十分发育,受岩性和构造影响共发育五套岩溶系统。针对平寨水库左岸防渗帷幕地段,基于施工现场左岸帷幕灌浆平硐揭露溶洞发育信息,分析岩溶溶蚀特征,归纳岩溶发育规律。研究得出岩溶溶蚀受地质构造和地层岩性影响在垂直方向上岩溶溶蚀由上往下逐渐增强,在水平方向上溶蚀离河岸由远及近逐渐增强,局部区域受地层岩性和构造控制集中发育的岩溶发育规律。

著录项

相似文献

  • 中文文献
  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号