本文结合其他电站的情况,在整个安装调试阶段会同设计制造、安装及监理单位对机组相关项目(含部件)进行了优化,取得了较好的运行效果.本文对清远抽水蓄能机组在运行过程中存在的问题进行了细致地分析研究,并且提出了合理的处理方案,对于确保清蓄机组安全可靠运行发挥了重要作用,为在建和拟建蓄能电站国产化后续项目借鉴和参考.%This paper introduces the installation and commissioning phase of each system of Qingyuan pumped storage power station.At the same time combining with other power stations of the installation and debugging of the unit is optimized to improve the efficiency of the unit installation and debugging and provide valuable experience for the construction of such plant.