In order to improve the soil and water conservation section to write and do open-pit coal mine soil and water conservation work, this article introduces the available practice from the project site selection, analysis and correction of construction scheme, the occupation and estimation of earth-rock, forecast of soil erosion, measures design and investment estimation.%为了完善水土保持章节的编写、做好露天煤矿水土保持工作,从项目区概况介绍、对项目选址和建设方案的分析与修正、占地面积及土石方量估算、水土流失预测、措施设计及投资估算等方面提供了参照。
展开▼