Combining with the engineering practice, this paper analyzed the advantages and disadvantages of cast-in-situ pre-stressed concrete hollow slab construction, and from the construction preparation, pre-stressed reinforcement and filling material laying, installation slab reinforcement and other aspects, elaborated the construction technology of cast-in-place pre-stressed hollow slab, ensured the construction quality.%结合工程实例,分析了现浇预应力空心板施工的优缺点,并从施工准备、预应力筋与填充材料铺放、安装板面钢筋等方面,阐述了现浇预应力空心板的施工技术,保证了工程的施工质量.
展开▼