Combining with the engineering examples of Hangzhou city road through Shanghai-Hangzhou highway,from the economic indicators, traffic organization,construction difficulty and other aspects,analyzed and compared the three road through schemes,finally using the high-speed whole lifting scheme,and discussed its construction organization process,in order to improve the rationality and practical of road construction.%结合杭州城市道路穿越沪杭甬高速公路的工程实例,从经济指标、交通组织、施工难度等方面,对三种道路穿越方案进行了分析比选,最终采用高速原位路改桥整体抬升方案,并对其施工组织流程进行了论述,以提高道路施工的合理性和可实施性。
展开▼