Combining with the fact of some project,the paper identifies the organization scheme for the deck pavement,introduces the craft prin-ciple of the epoxy asphalt mixture pavement on concrete decks,explores its optimal proportional ratio of the upper and lower decks,and points out the technical points for the binding materials spraying,so as to ensure the quality of the bridge deck.%结合某工程的实际情况,确定了桥面铺装施工组织方案,介绍了环氧沥青桥面铺装的工艺流程,并探讨了上下面层桥面铺装环氧沥青混合料的最佳配合比,提出了粘结料喷洒的技术要点,旨在确保桥面铺装的质量。
展开▼