对清洗道床、布置场地、设置测量控制桩、铺设组合式轨道排架等隧道弹性支承块式无砟道床施工技术进行了阐述,并对测量控制、混凝土施工、钢筋笼制作等主要工序控制措施作了总结,以达到良好的施工效果。%This paper elaborated the construction technology of bed for cleaning,decorating the venue,setting the measurement control pile,lay-ing of combined rail bent frame and other tunnel low vibration track ballast-less track bed,and summarized the control measures of measurement control,concrete construction,steel reinforcement cage production and other main processes,in order to achieve good construction effect.
展开▼