This paper briefly analyzed the status of our construction engineering cost control,based on this put forward effective control methods for construction engineering cost from decision-making,design,implementation,completion settlement four stages,in order to reduce the overall investment resources.%对我国建设工程造价控制的现状进行了简要分析,在此基础上从决策、设计、实施、竣工结算四个阶段提出了建设项目工程造价的有效控制方法,以期减少建设项目的整体投资额。