在明确工程价款结算涵义的基础上,对DBB模式下引起价款结算纠纷的原因进行了全面分析,指出工程变更是最为主要的原因,并对工程变更引起价款结算纠纷的问题进行了具体分析,探究了相关解决途径和度量方式,以达到解决纠纷的目的。%Based on identifying project price settlement connation,the paper comprehensively analyzes price settlement dispute causes under DBB mode,points out major causes of engineering change,specifically analyzes prices settlement dispute problems owning to engineering change,and explores relevant solving methods and measurement methods,with a view to solve the dispute.
展开▼