依据GB/T 50319-2013建设工程监理规范的基本要求,分析了总监代表在现场工作中的重要性,并从内部管理、协调关系、汇报工作等方面论述了总监代表的工作内容,以真正促使总监代表达到分担总监工作压力的效果。%According to the basic requirements of GB/T 50319-2013 Construction Engineering Supervision Specification, analyzed the importance of director representatives in field work, and discussed the work contents of director representative from internal management, coordinate relation-ships, reporting work and other aspects, so as to really promote the effects make director representative to share director work pressure.
展开▼