首页> 中文期刊> 《山西建筑》 >B型梁连续托换既有铁路的可行性研究

B型梁连续托换既有铁路的可行性研究

         

摘要

In the construction of a frame bridge under existing railway, the B type girder must be transformed into continuously supported state, and two system transformation schemes were proposed, their feasibility were studied through software Midas/Civil and ANSYS. By these comparisons and analysis, it can be drawn that after the system transformation of five B type girders from simply supported state into nine spans continuously girder, each component of the B type girders can bear the train load, and the forced state of frame bridge can also meet the standard requirements.%在某下穿框构桥施工中,通过体系转换将B型梁转变为连续受力状态,并采用Midas/Civil和ANSYS软件对两种体系转换方案进行对比分析,结果表明:将5片B型梁转换为9跨连续梁后,各构件受力能够满足列车通行要求,框构桥受力也能满足规范要求。

著录项

相似文献

  • 中文文献
  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号