从施工企业角度入手,简要阐述了建筑工程事前、事中、事后各个阶段的造价控制要点及措施,通过各环节工程造价的有效控制,从而确保工程投资控制在限定的额度内,以提高企业经济效益。%Starting from the aspect of construction enterprise,the article describes cost control points and measures of building engineering from three stages of advance,going on,afterwards.Through effectively controlling engineering cost at various links,it ensures the bond-fund limits of engineering investment,so as to improve the economic benefits of enterprises.
展开▼