首页> 中文期刊> 《山西建筑》 >上海白龙港蛋形消化池后张有粘结预应力施工

上海白龙港蛋形消化池后张有粘结预应力施工

         

摘要

针对上海白龙港蛋形消化池后张有粘结预应力施工进行了介绍,阐述了消化池有粘结预应力制孔、试验、张拉、灌浆施工技术和验收标准,并对后张有粘结预应力施工中需注意的问题进行了探讨,为今后同类工程提供了借鉴和参考。%The paper introduces the post-tension bonding prestressed construction of oval digestion tank of Bailonggang of Shanghai, illustrates the construction technique and acceptance standards for the holing, the experiment, the tension, and grouting of the bonding prestressed con- struction of oval digestion tank, and explores the precautions for the post-tension bonding prestressed construction of oval digestion tank, so as to provide some reference for similar projects in future.

著录项

相似文献

  • 中文文献
  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号